• Project Type: Commercial Façade/Windows
  • Client: Higgins Construction
  • Location: Reading
  • Architect: N/A
  • Status: Planning
  • Value: Circa £2.1M

Brief:

To remove 289 windows and doors, carry out cavity closure work and supply and install 289 Aluprof windows. Carry out all internal reveal works to an agreed design

Project Details

Crossway Point Reading is owned by the Catalyst Housing Association and, as part of ongoing fire remediation works, we were appointed by the main contractor, Higgins Group, to replace 289 windows and doors.

All flats were occupied, and a careful programme had to be adhered to working with the Liaising Officer with the flexibility to make last minute changes if required.

Working to a very tight programme and working with multiple trades on the scaffold, the logistics of the site were challenging. All materials were stored off site and had to brought to site daily.

Main Features

  1. Remove all windows and doors
  2. Design new window install application
  3. Design new Z bracket for new doors
  4. Investigation works
  5. Supply and install fire barrier into cavity
  6. Supply and install new steel cavity closure
  7. Supply and install fire-rated mastic as per design
  8. Supply and install new windows and doors
  9. External mastic as per design
  10. Repairs to internal reveals
  11. Decoration/Carpentry to internal reveals
  12. Supply and install new fire-rated decking to all balconies
  13. Glass block fire works
  14. Supply and install new fire-rated vents
  15. Brickwork repairs

Accreditations

Concept to completion