• Project Type: Commercial Façade/Windows
  • Client: Higgins Construction
  • Location: Slough
  • Architect: N/A
  • Status: Planning
  • Value: Circa £3.5M

Brief:

To remove 260 windows and doors, carry out cavity closure work and supply and install 289 Aluprof windows. Carry out all internal reveal works to an agreed design. Brick removal and installation.

Project Details

Priory Heights is owned by the Catalyst Housing Association and, as part of ongoing fire remediation works, we were appointed by the main contractor Higgins for replacement of the 260 windows and doors, brick removal, infill installation and brick installation.

All flats were occupied, and a careful programme had to be adhered to working with the Liaising Officer with the flexibility to make last minute changes if required.

Working to a very tight programme and working with multiple trades on the scaffold the logistics of the site was challenging. All materials were stored off site and had to brought to site daily.

Main Features

  1. Remove all windows and doors
  2. Design new window install application
  3. Design new Z bracket for new doors
  4. Investigation works
  5. Supply and Install fire barrier into cavity
  6. Supply and install new steel cavity closure
  7. Supply and install fire-rated mastic as per design
  8. Supply and install New Window and doors
  9. External mastic as per design
  10. Repairs to internal reveals
  11. Decoration/Carpentry to internal reveals
  12. Supply and install new fire-rated vents
  13. Brickwork removal
  14. Insulation installation
  15. Y-Wall board installation
  16. Fire barriers installation
  17. Brick reinstatement

Accreditations

Our chosen charity for 2025

Concept to completion

Copyright 2023 Full Works Projects Limited is registered in England & Wales No. 9643365. VAT No. 164 6479 77
Registered Office: 12-16 Lionel Road, Canvey Island, Essex, SS8 9DE

Privacy Policy

Website Design by Pipe Media